Construction Budget Workbook

NGN
  • NGN
  • GBP
  • USD

₦28,075.00

Get the Construction Budget Workbook — stop guessing where your budget stands, and start knowing.

Know Exactly Where Your Project’s Money Is Going — Before It’s Gone.

A fully automated Excel costing, tracking, and cash-flow system built for contractors and MEP project teams — enter your numbers once, and every total, subtotal, and chart updates itself.

Budget overruns don’t announce themselves. They creep in — a labour rate that was never updated, a variation order nobody tallied, a cash-flow gap nobody saw coming until the money was already due. By the time a spreadsheet full of manual totals catches up to reality, the damage is done.

The Construction Budget Workbook is built so that never happens. Enter quantities, rates, and dates — the workbook does every calculation, cross-reference, and rollup automatically, and flags a funding gap in red before it becomes a crisis.

What it is

A 6-sheet, fully linked Excel budgeting system: Summary Dashboard, BOQ, Labour Rates, Material Tracker, Cash Flow, and Variation Orders — all connected, so a number entered once flows everywhere it needs to.

What’s inside

  • Summary Dashboard — a live, one-page overview of budget, cost, and cash position that pulls automatically from every other sheet. This is the page you open at every project review.
  • Bill of Quantities (BOQ) — enter item, unit, quantity and rate; material cost, labour cost, and line totals calculate instantly, with labour rates pulled automatically from your rate table
  • Labour Rates — set every trade’s rate once; it updates the entire BOQ from a single cell
  • Material Tracker — log orders by supplier, quantity, price, and delivery status, kept in sync with procurement
  • Cash Flow — plan monthly inflows and outflows against actuals, with a running cumulative balance that’s automatically highlighted in red the moment it goes negative — so a funding gap shows up as a warning, not a surprise
  • Variation Orders — track every scope change with cost and time impact; only approved VOs flow into your revised budget, so nothing inflates your numbers before it’s confirmed
  • Built-in bar chart — Planned vs. Actual Net Cash Flow, generated automatically from your Cash Flow sheet

Why it works

  • Zero manual math — every total is a live formula, not a number you have to remember to update
  • One source of truth — change a labour rate once, and every BOQ line that uses that trade updates itself
  • Built-in guardrails — color-coded cells tell you exactly where to type (yellow) and what not to touch (white = auto-calculated)
  • Example rows included — every table starts with a real, filled-in example so the expected format is obvious from the first look
  • Genuinely audit-tested — every formula in this workbook has been verified to calculate correctly, with zero errors, across all 197 formulas

Who it’s for

Contractors and subcontractors managing project budgets · MEP and civil project teams · Site and project managers responsible for cost control · Consultants preparing cost reports for clients · Anyone tired of rebuilding the same SUM formulas every project

Objection handling

“I can just use a basic spreadsheet.” — You can, until a formula breaks, a rate changes on 40 line items, or you need to explain a cash shortfall in a client meeting with 10 minutes’ notice. This workbook is that basic spreadsheet, already built, already tested, and already linked.

“Is this locked down / hard to edit?” — No macros, no hidden logic. It’s standard Excel formulas you can inspect, extend, or adjust at any time.

Guarantee / risk reversal

“Instant download. If it doesn’t fit your workflow, reach out within 7 days for a full refund.”

Get the Construction Budget Workbook — stop guessing where your budget stands, and start knowing.

Reviews

There are no reviews yet.

Be the first to review “Construction Budget Workbook”

Your email address will not be published. Required fields are marked *